New China net Beijing, April 12 – (by Lu Guoqiang Li extends) 12th is Beijing implements the wrong peak coming and going to work measure the first day, reporter from hands over the tube department to find that the early peak Beijing traffic circulation is normal at the same day, after the peak time interval appears wrong. on 12th about 7:40, reporter north Beijing two links saw that west the main road the orientation is slow to the car dealership, speed insufficient 20 kilometers. At the same time, Badaling goes to the capital the direction, the capital airport tie line to go to the capital high speed the direction as well as the Xizhimen bridge, west road sections and so on two links presents the varying degree to support stops up. Reporter hands over the administrative bureau from Beijing public security the Control center to find, 8:00, urban expressway supports stops up the road section is 71, about 9:00 is 68, 9:30 drop to 59. Supports stops up a section mainly to concentrate in conventions and so on school, hospital and ring circuit tie line stops up the spot. Because the school, the hospital have not changed the daily schedule, delivered the student the guardian as well as to the hospital seeing a doctor resident must according to the former time journey, caused units and so on school, hospital peripheral to appear supports stops up.
Beijing handed over the administrative bureau Control center Assistant Director Zhang Chenjun saying that on 12th on Monday, looking from each data comparison, same day’s early peak traffic current capacity compares formerly same time dropped, after the peak time interval had makes a mistake. It is reported that the former Beijing transportation early peak time interval concentrates generally from 7:30 am to about 8:30, after implementing the wrong peak coming and going to work measure, after part of residents go out the time mistake, causes from 8:00 to about 8:30 traffic flow magnitude obvious rise.
Hands over the tube sector analysis, because 12th is the wrong peak coming and going to work measure implementation the first day, many residents need an adaptation the process, estimated after period of time, Beijing peak time interval traffic flow will present the change. When from 12th, Beijing shishu all levels of Party and government organizations, the social group, the Institution, the State-owned business and the cities Collective enterprise, the work hours by 8:30 adjustments are 9, the rush hour by 17:30 adjustments is when 18. In the Beijing Central committee State agency and the respective social group and the Enterprises and institutions, the school, the hospital, the large-scale market drive time is invariable. Estimated that this measure involves 810,000 people.